ESS GU SERIES

UPS power supply series

LiFePO4 battery cabinets for UPS backup applications, covering published ESS GU configurations from 5.18 kWh to 107.52 kWh.

  • Published 5–108 kWh UPS battery configurations
  • 2C standard and optional 4C high-rate discharge
  • CAN / RS485 communication for UPS coordination
  • Air-cooled cabinet formats with model-specific DC voltage ranges
  • Request a configuration review before selecting the final system

Send Your Inquiry

YINEN POWER UPS 电源系列机柜

CONFIGURE YOUR BACKUP

ESS GU UPS battery models

The four published ESS GU product groups below cover twelve capacity configurations. Confirm the load profile, UPS DC bus requirement, required autonomy and local installation conditions before ordering.

YINEN POWER ESS GU 5 至 21 kWh UPS 机柜

ESS GU 5 / 10 / 21 kWh

5.18–21.12 kWh192 / 384 VDC

Models: 5 / 10 / 21 kWh

Discharge current: 54 / 110 A

Cabinet height: 900–1850 mm

Send Inquiry

YINEN POWER ESS GU 40 至 108 kWh UPS 机柜

ESS GU 40 / 54 / 80 / 108 kWh

40.32–107.52 kWh192–512 VDC

Models: 40 / 54 / 80 / 108 kWh

Discharge current: 210 / 420 A

Air cooling: Published

Send Inquiry

YINEN POWER ESS GU 11 至 30 kWh UPS 机柜

ESS GU 11 / 23 / 30 kWh

11.52–30.72 kWh192–512 VDC

Models: 11 / 23 / 30 kWh

Discharge current: 240 A

Cell capacity: 60 Ah

Send Inquiry

YINEN POWER ESS GU 46 至 61 kWh UPS 机柜

ESS GU 46 / 61 kWh

46.08 / 61.44 kWh192 / 256 VDC

Models: 46 / 61 kWh

Discharge current: 480 A

Cell capacity: 120 Ah

Send Inquiry

PRODUCT OVERVIEW

Dedicated battery cabinets for UPS continuity

The ESS GU series uses published LiFePO4 battery configurations for UPS backup projects. The factory brochure describes high-current discharge options, wide DC-voltage adaptation and CAN/RS485 communication for coordinated battery monitoring.

Final selection must be based on the UPS model, DC bus voltage, continuous and peak load, required backup time, available installation space, transport route and applicable local requirements.

Published shared data

Battery chemistry: LiFePO4

Communication: CAN / RS485

Ingress protection: IP20

Charge / discharge: 0–55 °C / −20–55 °C

Humidity: 0–95% non-condensing

TECHNICAL DATA

ESS GU UPS power supply specifications

ModelEnergyNominal voltageVoltage rangeMax. dischargeDimensions (L × W × H)
ESS GU 5 kWh5.18 kWh192 VDC174–218 VDC54 A600 × 700 × 900 mm
ESS GU 10 kWh10.37 kWh384 VDC348–432 VDC54 A600 × 700 × 1500 mm
ESS GU 21 kWh21.12 kWh384 VDC348–432 VDC110 A700 × 700 × 1850 mm
ESS GU 40 kWh40.32 kWh384 VDC348–432 VDC210 A1100 × 700 × 2200 mm
ESS GU 54 kWh53.76 kWh512 VDC464–576 VDC210 A800 × 1210 × 1550 mm
ESS GU 80 kWh80.64 kWh192 VDC174–216 VDC420 A1100 × 700 × 2200 mm
ESS GU 108 kWh107.52 kWh256 VDC232–288 VDC420 A1100 × 1210 × 1550 mm
ESS GU 11 / 23 / 30 kWh11.52 / 23.04 / 30.72 kWh192 / 384 / 512 VDC174–218 / 348–432 / 464–576 VDC240 A700 × 700 × 1250 / 2200 mm; 700 × 1210 × 1550 mm
ESS GU 46 / 61 kWh46.08 / 61.44 kWh192 / 256 VDC174–218 / 232–288 VDC480 A1150 × 700 × 2200 mm; 1150 × 1210 × 1550 mm

Specifications are transcribed from the supplied factory brochure and remain subject to the latest factory documentation.

APPLICATION SCENARIOS

Where UPS power supply batteries fit

Critical-facility backup

Define the protected loads, start-up current and required autonomy for data rooms, telecom facilities, control rooms or other essential equipment.

UPS retrofit planning

Check the UPS DC bus window, communication requirements, protection coordination and cabinet footprint before replacing a legacy battery system.

High-current discharge duty

Review both steady-state demand and peak discharge requirements to determine whether the standard or high-rate configuration is suitable.

Scalable project delivery

Confirm installation access, maintenance clearance, transport constraints, site temperature and future expansion needs in the project design.

COMMON QUESTIONS

Frequently Asked Questions

Which ESS GU model should I choose?

Share the UPS model, DC voltage window, load profile, peak demand, target backup time, installation location and destination country. The final configuration must be checked against the latest factory documentation.

Can these cabinets communicate with a UPS?

The supplied brochure lists CAN and RS485 communication. Confirm the exact UPS protocol and battery-management compatibility for the intended project.

Are all ESS GU models suitable for the same voltage range?

No. Published nominal voltages and working ranges differ by model. Use the specification table to shortlist compatible models, then obtain final factory confirmation.

What information is needed for a quotation?

Please provide your UPS model, required energy, DC bus voltage, load data, backup time, installation location, destination country and quantity.

When is a high-rate discharge configuration needed?

High-rate discharge selection should be based on the UPS load profile, peak current, required autonomy and battery-duty cycle. Provide these values for a model-specific engineering review instead of selecting by energy capacity alone.

What installation environment should be prepared?

Plan adequate cabinet clearance, ventilation, maintenance access, a suitable transport route and a dry indoor environment. The brochure states IP20 protection, so the final installation must follow the applicable site and electrical requirements.

Can a UPS battery system be expanded later?

Expansion feasibility depends on the UPS DC bus, the selected ESS GU model, BMS communication, protection design, battery consistency and the available physical space. Confirm the expansion plan before the initial configuration is ordered.

PROJECT CONFIGURATION

Build the right UPS power supply system

Share your UPS model, DC bus voltage, energy target, backup time, location and quantity for a practical configuration review.

Send Your Inquiry